Photo Gallery

Interstate 295/Interstate95/S.R. 9A Interchange

A new interchange is being constructed at Interstate 295, Interstate 95 and State Road 9A.

0 photos

Summer Haven Bridges in St. Johns County

Summer Haven Bridges Construction Progress Photos Construction to replace two low level bridges on State Road A1A in Summer Haven, just north of Marineland, began September 9. Contractor, Misener Marine Construction Inc., has been hired by the FDOT to replace the two bridges at a cost of $11,756,527.75.

25 photos

State Road 26 at US 301 Overpass Construction

An overpass is being constructed on State Road 26 over U.S. 301 and the adjacent CSX railroad. The $9.9 million, federally-funded 1.7 mile project was designed to improve safety for motorists traveling on State Road 26 and trying to cross U.S. 301 and the CSX railroad tracks.

5 photos

Main Street (State Road 329) in Gainesville

The reconstruction of Main Street between Depot Avenue and Northwest Eighth Avenue is scheduled to begin in September and take approximately two years to complete.

5 photos

SR A1A Resurfacing in Ponte Vedra

State Road A1A is being resurfaced from Fairfield Boulevard/Sawgrass Drive to the Duval County line.

3 photos

State Road 9B from S.R. 9A to U.S. 1 (Philips Highway)

The location for the new State Road 9B connection at State Road 9A.

5 photos

University Avenue (S.R. 26) Resurfacing

Curb and Sidewalk work

2 photos

State Road 100 Resurfacing Bradford County

Improvements to State Road 100 in Bradford County between the Clay County line and County Road 100A, just east of Starke, began in early December, according to Florida Department of Transportation (FDOT).

2 photos

State Road 238 Improvements

Olustee Creek Bridge

0 photos