Main Street (State Road 329)
In June 2000, the Metropolitan Transportation Planning Organization (MTPO) amended their Long Range Plan to include the Main Street reconstruction project, reducing Main Street from four lanes to two lanes with a center turn lane between Depot Avenue and NW 8th Avenue. Construction of this project began September 8th and is expected to take about two years to complete.
North Main Street (County Road 329)
Resurfacing from north of Northeast Eighth Avenue to south of Northeast 23rd Avenue (1.4 miles). The section from Northwest Eighth to Northwest 16th avenues will be reduced from four lanes to three lanes providing a center turn lane. The section from Northwest 16th to Northwest 23rd avenues will remain four lanes. Also, the sidewalks on the east side will be improved.
University Avenue (State Road 26) Resurfacing
Improvements to University Avenue (State Road 26) in Gainesville from Gale Lemerand Drive to just east of Waldo Road are underway. The project extends east to just past Waldo Road to include a section of roadway near the SR 20/26 split that was not included in earlier projects.
Northwest County Road 235A Sidewalk Addition
Constructing a 5-foot sidewalk on the east side of the road from U.S. 441 to Santa Fe High School and then cross over to the west side of the roadway and build sidewalk to about 1,000 feet north of Northwest 168th Avenue (.5 mile).
U.S. 41 (State Road 45) Improvements
A Florida Department of Transportation (FDOT) project to add a right turn lane from southbound U.S. 41 in Newberry onto Southwest 30th Avenue. In addition to the new turn lane, half a mile of SW 30th Avenue, will be paved.
Baker
Interstate 10 Master Plan West
The purpose of an Interstate Master Plan is to guide the development of a multi-modal interstate system that will serve the transportation needs of people, provide for the efficient and effective movement of freight, and foster economic growth and development in the region as well as the state as a whole.
Bradford
Northwest County Road 229 Improvements
Improvements to Northwest County Road 229 in Bradford County between State Road 16 and Northwest 177th Street began in early January with draingage and sholder work in preparation for widening and resurfacing.
State Road 100 Resurfacing
Improvements to State Road 100 in Bradford County between the Clay County line and County Road 100A, just east of Starke, began in early December, according to Florida Department of Transportation (FDOT).
Clay
Knight Boxx Road (County Road 220B) Resurfacing
Improvements to Knight Boxx Road (County Road 220B) in Clay County are scheduled to begin Friday, February 22 which will require daytime lane closures and other possible impacts to residents and motorists who use this busy county roadway.
Columbia
Interstate 10 Master Plan West
The purpose of an Interstate Master Plan is to guide the development of a multi-modal interstate system that will serve the transportation needs of people, provide for the efficient and effective movement of freight, and foster economic growth and development in the region as well as the state as a whole.
County Road 252 Resurface and Widening
Improvements to County Road 252 (Pinemount Road) in Suwannee County began Monday, January 4. This roadway project will require daytime lane closures and other impacts to residents and motorists who use this county roadway. The project, located between the Columbia County line and County Road 137, will resurface and widen the roadway three feet on each side to provide 12-foot travel lanes.
State Road 238 Improvements
Work began in late January on a project to improve 15 miles of State Road 238 between U.S. 441 in Columbia County and State Road 231 in Union County, according to the Florida Department of Transportation (FDOT). The improvements include resurfacing the travel lanes and replacing the bridge railing on the Olustee Creek Bridge at the Columbia/Union County line.
Dixie
Dixie County Sidewalks
Build bike lane and sidewalks along roads County Road 55A in Old Town and County Road 351 in Cross City.
U.S. 19 Intersection Improvements
U.S. 19 Intersection improvements at County Road 351A in Cross City includes widening the intersection to improve turns, adding paved shoulders in the southern quadrant and resurfacing County Road 351A just north and south of U.S. 19.
Duval
Interstate 10/Interstate 95 Interchange Reconstruction
The I-10/I-95 Interchange from Stockton Street and the Fuller Warren Bridge to Adams Street is currently under construction. The project will not only increase the capacity of the Interchange but will also eliminate many of the current cross-lane weaving movements that drivers must negotiate as they use the current interchange. (2132431)
Interstate 10 from east of Halsema Road to Lane Avenue
A Florida Department of Transportation project to widen and improve 8.2 miles of I-10 from Lane Avenue to east of Halsema Road began in January 2009. The $58 million construction project involves widening I-10 from four to six lanes from I-295 to east of Halsema Road. Construction is scheduled to be complete in the spring of 2012.
Interstate 10 Master Plan West
The purpose of an Interstate Master Plan is to guide the development of a multi-modal interstate system that will serve the transportation needs of people, provide for the efficient and effective movement of freight, and foster economic growth and development in the region as well as the state as a whole.
Interstate 10 Master Plan East
A master plan for interstate Highway 10 (I-10) from east of I-295 at Lane Avenue to Stockton Street was completed in February 2009.
State Road 228 Hart Bridge Repainting
The Hart Bridge repainting project is scheduled to start on Monday, February 9 and should be completed by the spring of 2011. The 3,844-foot long, 65-foot wide and approximate 150-foot high bridge will be repainted. The bridge will keep its same green color.
Levy
Manatee Springs Bike Trail
Levy County residents who may want to get in shape this New Year will be able to benefit from a new bike lane to be built along State Road 320, according to Florida Department of Transportation (FDOT).
Madison
Interstate 10 Master Plan West
The purpose of an Interstate Master Plan is to guide the development of a multi-modal interstate system that will serve the transportation needs of people, provide for the efficient and effective movement of freight, and foster economic growth and development in the region as well as the state as a whole.
Nassau
Interstate 10 Master Plan West
The purpose of an Interstate Master Plan is to guide the development of a multi-modal interstate system that will serve the transportation needs of people, provide for the efficient and effective movement of freight, and foster economic growth and development in the region as well as the state as a whole.
North Eighth Street and North 14th Street
Resurface North Eighth Street from Dade Street to the Port of Fernandina (.25 miles) and resurface North 14th Street from Broome Street to the end of Pogy Place in Fernandina Beach.
Putnam
St. Johns
SR A1A Summer Haven Bridges Replacement
Replace two low level bridges over the Matanzas River in Summer Haven. Misener Marine Construction, Inc., began September 2009 at a cost of $11,756,527.75.
Interstate 95 Ramps at State Road 207
The Interstate 95 exit ramps onto State Road 207 will be widened to increase capacity and help prevent vehicles from backing up onto the interstate. The southbound exit ramp will accommodate two lanes of traffic turning east onto State Road 207 and one lane turning west. The northbound exit ramp will include one turn lane in each direction onto State Road 207. The turn lane from State Road 207 onto the northbound I-95 entrance ramp will also be extended.
County Road 13 Bridge Replacement over Sixteen Mile Creek
The Florida Department of Transportation (FDOT) began a $3.4 million project to replace Sixteen Mile Creek Bridge on County Road 13 in St. Johns County Monday, January 4.
The bridge will be replaced with a new 40-foot wide concrete bridge with two 12-foot lanes and two 8-foot emergency lanes. Currently, the existing bridge, which was built in 1956, has a weight limit. Once the new bridge is constructed, the weight limit will be removed.
Crescent Beach Bridge on State Road 206
A bridge painting project for Verle Allyn Pope Bridge on State Road 206 that will require the bridge to be closed and all traffic detoured for 15 days during the 300-day project began this week, according to Florida Department of Transportation (FDOT). This project includes cleaning and painting the steel structure and replacing some of the rivets and bolts.
Suwannee
Interstate 10 Master Plan West
The purpose of an Interstate Master Plan is to guide the development of a multi-modal interstate system that will serve the transportation needs of people, provide for the efficient and effective movement of freight, and foster economic growth and development in the region as well as the state as a whole.
Interstate 10 from U.S. 90 to U.S. 129
Approximately nine miles of Interstate 10 from U.S. 90 to U.S. 129 in Suwannee County is scheduled to be resurfaced in 2011 at an estimated cost of $16 million.
County Road 252 Resurface and Widening
Improvements to County Road 252 (Pinemount Road) in Suwannee County began Monday, January 4. This roadway project will require daytime lane closures and other impacts to residents and motorists who use this county roadway. The project, located between the Columbia County line and County Road 137, will resurface and widen the roadway three feet on each side to provide 12-foot travel lanes.
Taylor
Perry Sidewalks
Design and build sidewalks around Perry Primary School and Taylor County Middle School.