Alachua

State Road 26 at US 301 Overpass Construction
An overpass is being constructed on State Road 26 over U.S. 301 and the adjacent CSX railroad.

Main Street (State Road 329)
In June 2000, the Metropolitan Transportation Planning Organization (MTPO) amended their Long Range Plan to include the Main Street reconstruction project, reducing Main Street from four lanes to two lanes with a center turn lane between Depot Avenue and NW 8th Avenue. Construction of this project began September 8th and is expected to take about two years to complete.

North Main Street (County Road 329)
Resurfacing from north of Northeast Eighth Avenue to south of Northeast 23rd Avenue (1.4 miles). The section from Northwest Eighth to Northwest 16th avenues will be reduced from four lanes to three lanes providing a center turn lane. The section from Northwest 16th to Northwest 23rd avenues will remain four lanes. Also, the sidewalks on the east side will be improved.

University Avenue (State Road 26) Resurfacing
Improvements to University Avenue (State Road 26) in Gainesville from Gale Lemerand Drive to just east of Waldo Road are underway. The project extends east to just past Waldo Road to include a section of roadway near the SR 20/26 split that was not included in earlier projects.

Northwest County Road 235A Sidewalk Addition
Constructing a 5-foot sidewalk on the east side of the road from U.S. 441 to Santa Fe High School and then cross over to the west side of the roadway and build sidewalk to about 1,000 feet north of Northwest 168th Avenue (.5 mile).

U.S. 41 (State Road 45) Improvements
A Florida Department of Transportation (FDOT) project to add a right turn lane from southbound U.S. 41 in Newberry onto Southwest 30th Avenue. In addition to the new turn lane, half a mile of SW 30th Avenue, will be paved.

Baker

Interstate 10 Master Plan West
The purpose of an Interstate Master Plan is to guide the development of a multi-modal interstate system that will serve the transportation needs of people, provide for the efficient and effective movement of freight, and foster economic growth and development in the region as well as the state as a whole.

Bradford

Northwest County Road 229 Improvements
Improvements to Northwest County Road 229 in Bradford County between State Road 16 and Northwest 177th Street began in early January with draingage and sholder work in preparation for widening and resurfacing.

State Road 100 Resurfacing
Improvements to State Road 100 in Bradford County between the Clay County line and County Road 100A, just east of Starke, began in early December, according to Florida Department of Transportation (FDOT).

Clay

U.S. 17/Doctors Inlet Bridge widening between Milwaukee Avenue and Creighton Road
Two additional lanes are being added to U.S. 17 (Park Avenue) from Creighton Road to Milwaukee Avenue (1.5 miles).

State Road 21 Black Creek Bridge Replacement
Construction on State Road 21 at the Black Creek began

Kingsley Avenue (State Road 224) Traffic Signals
Kingsley Avenue (State Road 224): Replace traffic signals at Debarry Avenue and Doctors Lake Drive.

Blanding Boulevard (State Road 21) Widening
Adding lanes from Old Jennings Road to Knight Boxx Road (1.2 miles).

County Road 214 Resurfacing and Widening
Resurface and pave shoulders from State Road 100 to County Road 315C (6.5 miles).

County Road 224A (Peoria Road) Widening and Resurfacing
Widening and resurfacing to add center turn lane from County Road 224 (College Drive) to just south of Moody Road (.3 miles).

Keystone Heights Sidewalk Construction
Constructing sidewalk along city streets to elementary and junior/high schools.

Kingsley Avenue (State Road 224) Turn Lane Addition
Add eastbound right turn lane to U.S. 17 southbound.

Knight Boxx Road (County Road 220B) Resurfacing
Improvements to Knight Boxx Road (County Road 220B) in Clay County are scheduled to begin Friday, February 22 which will require daytime lane closures and other possible impacts to residents and motorists who use this busy county roadway.

Columbia

Interstate 10 Master Plan West
The purpose of an Interstate Master Plan is to guide the development of a multi-modal interstate system that will serve the transportation needs of people, provide for the efficient and effective movement of freight, and foster economic growth and development in the region as well as the state as a whole.

Interstate 10 from Suwannee County line to U.S. 441
Interstate 10 from the Suwannee County line to U.S. 441 (9.5 miles) is scheduled to be resurfaced in 2011 at an estimated $22 million.

Lake Jeffery Road (County Road 250) Resurfacing
Resurfacing from Interstate 75 to the Suwannee County line (3 miles).

Lake Jeffery Road (County Road 129) Resurfacing
Resurfacing from U.S. 90 (Duval Street) to the CSX Railroad crossing (.6 miles).

Lake City Sidewalks Additions for Safe Routes to School Program
Building sidewalks along city streets or county roads to Niblack and Westside elementary schools as part of the Safe Routes to School program.

County Road 252 Resurface and Widening
Improvements to County Road 252 (Pinemount Road) in Suwannee County began Monday, January 4. This roadway project will require daytime lane closures and other impacts to residents and motorists who use this county roadway. The project, located between the Columbia County line and County Road 137, will resurface and widen the roadway three feet on each side to provide 12-foot travel lanes.

State Road 238 Improvements
Work began in late January on a project to improve 15 miles of State Road 238 between U.S. 441 in Columbia County and State Road 231 in Union County, according to the Florida Department of Transportation (FDOT). The improvements include resurfacing the travel lanes and replacing the bridge railing on the Olustee Creek Bridge at the Columbia/Union County line.

Dixie

Dixie County Sidewalks
Build bike lane and sidewalks along roads County Road 55A in Old Town and County Road 351 in Cross City.

U.S. 19 Intersection Improvements
U.S. 19 Intersection improvements at County Road 351A in Cross City includes widening the intersection to improve turns, adding paved shoulders in the southern quadrant and resurfacing County Road 351A just north and south of U.S. 19.

State Road 51 Resurfacing and Bridge Replacement
Four bridges on State Road 51 in Dixie County will be replaced as part of an improvement project between the Taylor and Lafayette County lines by the Florida Department of Transportation.

Duval

Interstate 10/Interstate 95 Interchange Reconstruction
The I-10/I-95 Interchange from Stockton Street and the Fuller Warren Bridge to Adams Street is currently under construction. The project will not only increase the capacity of the Interchange but will also eliminate many of the current cross-lane weaving movements that drivers must negotiate as they use the current interchange. (2132431)

Interstate 10 from east of Halsema Road to Lane Avenue
A Florida Department of Transportation project to widen and improve 8.2 miles of I-10 from Lane Avenue to east of Halsema Road began in January 2009. The $58 million construction project involves widening I-10 from four to six lanes from I-295 to east of Halsema Road. Construction is scheduled to be complete in the spring of 2012.

Interstate 10 from Lane Avenue to Stockton Street
Rehabilitating concrete pavement between Lane Avenue and Stockton Street (4 miles).

Interstate 10 Interchange at Marietta/Hammond
Reconstruction of the Marietta interchange with Interstate 10 is in the FDOT's Five Year work program, project #213301-2 . Design plans are approximately 60% complete (Phase II).

Interstate 10 Master Plan West
The purpose of an Interstate Master Plan is to guide the development of a multi-modal interstate system that will serve the transportation needs of people, provide for the efficient and effective movement of freight, and foster economic growth and development in the region as well as the state as a whole.

Interstate 295, Interstate 95 and S.R 9A Interchange
Reconstruct interchange with Interstate 295, Interstate 95 North and State Road 9A including building a flyover ramp and adding interchange lighting. (2133234)

Interstate 295 at Collins Road Interchange and Collector Road
Construct a new Collins Road interchange and collector distributor road system at Interstate 295.

Interstate 295 Landscape from Commonwealth Avenue to half mile west of I-95
Landscape from Commonwealth Avenue to Duval Road or half a mile west of Interstate 95 (2132595)

Interstate 10 Master Plan East
A master plan for interstate Highway 10 (I-10) from east of I-295 at Lane Avenue to Stockton Street was completed in February 2009.

Interstate 95 from JT Butler Boulevard to Atlantic Boulevard
Rehabilitate 6.6 miles of concrete pavement on Interstate 95 between JT Butler Boulevard (State Road 202) and Atlantic Boulevard (SR 10) in 2010/11 at estimated $26.6 million. (2132172)*

Interstate 95 from south of Greenland to J. Turner Butler Boulevard
Rehabilitate 8.6 miles of concrete pavement on Interstate 95 from south of Greenland to J. Turner Butler Boulevard (State Road 202) in 2009/10 at estimated $36.8 million. Nelson Bedenbaugh/project designer. (2132175)

Interstate 95 at Southhampton and Hendricks Avenue
Replace the bridges on Interstate 95 at Southhampton and Hendricks Avenue in 2011/12 at estimated $132 million. Craig Teal, FDOT Project Manager. (2133043)

Interstate 95 ramp at Southside Boulevard
Improve Interstate 95 ramp at Southside Boulevard (State Road 115) in 2011/12 at estimated $191,000. (209622)

Interstate 95 from Lem Turner Road to Heckscher Drive
Landscape Interstate 95 from Lem Turner Road to Heckscher Drive in late 2010 at estimated $2 million. John Thrasher, FDOT Project Manager. (2132452)

Interstate 295 Master Plan
Work on an I-295 Master Plan is schedule to begin in June 2008.

State Road 9A Landscape at Butler Blvd Interchange
Landscaping State Road 9A at the Butler Boulevard Interchange (State Road 202) in 2010/2011. Jessee Manalo is FDOT Project Designer. (2092783)

State Road 9A from Main Street to New Berlin Road
Resurface State Road 9A from Main Street to New Berlin Road. (2133463)

State Road 9A from Monument to I-95 North ITS
Install Intelligent Transportation System (ITS) from Monument to I-95 North at an estimated $7.8 million. (2132383, 2132385).

State Road 228 Hart Bridge Repainting
The Hart Bridge repainting project is scheduled to start on Monday, February 9 and should be completed by the spring of 2011. The 3,844-foot long, 65-foot wide and approximate 150-foot high bridge will be repainted. The bridge will keep its same green color.

State Road 9B from SR 9A to US 1 (Philips Highway)
Phase one of State Road 9B begins at State Road 9A and extends approximately three miles to U.S. 1.

State Road 9B from U.S. 1 to Interstate 95
State Road 9B is proposed to extend from U.S. 1 to Interstate 95 during phase two.

Interstate 95 Intelligent Transportation System
Adding Intelligent Transportation System (ITS) from just south of the Duval County line to north of Interstate 295.

Atlantic Boulevard (State Road 10)
Resurfacing from Kings Avenue to University Boulevard (3 miles) and adding traffic signal at U.S. 1 under I-95.

Atlantic Boulevard (State Road 10) and Third Street (State Road A1A) Update Traffic Signals
Updating traffic signals from Mayport Road to Ninth Avenue North.

Beach Boulevard (U.S. 90) Lane Addition between Hodges Blvd and San Pablo Road
Adding two lanes between Hodges Boulevard and San Pablo Road (1.5 miles).

Edgewood Avenue (State Road 111) Replacing Traffic Signals
Replacing traffic signals from Beaver Street (U.S. 90) to Kings Road (2.3 miles).

Hart Bridge (State Road 228) Repairs and Repainting
Repairing the steel and repainting the bridge over the St. Johns River.

Levy

County Road 40 Resurfacing from Ball Park Road to Peaceful Acres Road
Resurfacing from Ball Park Road to Peaceful Acres Road (Southeast 116th Avenue) (3.5 miles).

U.S. 19 Resurfacing from State Road 24 in Otter Creek Southeast Fourth Street in Chiefland
A Florida Department of Transportation (FDOT) project along 11 miles of U.S. 19 in southern Levy County began Monday, Jan. 4. The project includes resurfacing the roadway, adding paved shoulders and extending drainage structures.

Manatee Springs Bike Trail
Levy County residents who may want to get in shape this New Year will be able to benefit from a new bike lane to be built along State Road 320, according to Florida Department of Transportation (FDOT).

Madison

Interstate 10 Master Plan West
The purpose of an Interstate Master Plan is to guide the development of a multi-modal interstate system that will serve the transportation needs of people, provide for the efficient and effective movement of freight, and foster economic growth and development in the region as well as the state as a whole.

Nassau

Interstate 10 Master Plan West
The purpose of an Interstate Master Plan is to guide the development of a multi-modal interstate system that will serve the transportation needs of people, provide for the efficient and effective movement of freight, and foster economic growth and development in the region as well as the state as a whole.

North Eighth Street and North 14th Street
Resurface North Eighth Street from Dade Street to the Port of Fernandina (.25 miles) and resurface North 14th Street from Broome Street to the end of Pogy Place in Fernandina Beach.

State Road A1A Adding Two Lanes from Griffin Road to Stratton Road
Adding two lanes from Griffin Road to Stratton Road including replacing the bridges over Mills Creek and Boggy Creek (6 miles).

Putnam

County Road 315 Sidewalk Construction
Constructing a 5-foot wide concrete sidewalk on the west of the roadway from Sleepy Hollow Drive to the Interlachen Library (1.7 miles).

Silver Lake Drive Drainage Repairs
Replacing drainage pipes with two box culverts at Two Mile Creek and at Devall Branch.

St. Johns Avenue Resurfacing from State Road 19 to Palm Avenue
Resurfacing from State Road 100 to U.S. 17 (1 mile).

St. Johns

Bridge of Lions (State Road A1A) Rehabilitation
The historic Bridge of Lions over the Intercoastal Waterway is being rehabilitated.

U.S. 1 Resurfacing in St. Johns County
U.S. 1 from Moultrie Creek to State Road 207 is being resurfaced

SR A1A Summer Haven Bridges Replacement
Replace two low level bridges over the Matanzas River in Summer Haven. Misener Marine Construction, Inc., began September 2009 at a cost of $11,756,527.75.

State Road A1A Resurfacing in Ponte Vedra Beach
A resurfacing project on State Road A1A, from the Duval County line to Fairfield Boulevard/Sawgrass Drive in Ponte Vedra Beach began on August 31.

Interstate 95 Ramps at State Road 207
The Interstate 95 exit ramps onto State Road 207 will be widened to increase capacity and help prevent vehicles from backing up onto the interstate. The southbound exit ramp will accommodate two lanes of traffic turning east onto State Road 207 and one lane turning west. The northbound exit ramp will include one turn lane in each direction onto State Road 207. The turn lane from State Road 207 onto the northbound I-95 entrance ramp will also be extended.

County Road 13 Bridge Replacement over Sixteen Mile Creek
The Florida Department of Transportation (FDOT) began a $3.4 million project to replace Sixteen Mile Creek Bridge on County Road 13 in St. Johns County Monday, January 4. The bridge will be replaced with a new 40-foot wide concrete bridge with two 12-foot lanes and two 8-foot emergency lanes. Currently, the existing bridge, which was built in 1956, has a weight limit. Once the new bridge is constructed, the weight limit will be removed.

Del Monte Avenue, Durbin Creek Boulevard and Varella Avenue Sidewalk Addition
Building sidewalks along these county roadways (total of 2,800 linear feet) began in December 2009.

Interstate 95 Intelligent Transportation System
Adding Intelligent Transportation System (ITS) from just south of the Duval County line to north of Interstate 295.

State Road A1A Landscaping
Landscaping from Owens Avenue to State Road 312 (4 miles).

State Road 312 Landscaping
Landscaping from U.S. 1 to State Road A1A.

Crescent Beach Bridge on State Road 206
A bridge painting project for Verle Allyn Pope Bridge on State Road 206 that will require the bridge to be closed and all traffic detoured for 15 days during the 300-day project began this week, according to Florida Department of Transportation (FDOT). This project includes cleaning and painting the steel structure and replacing some of the rivets and bolts.

Suwannee

Interstate 10 Master Plan West
The purpose of an Interstate Master Plan is to guide the development of a multi-modal interstate system that will serve the transportation needs of people, provide for the efficient and effective movement of freight, and foster economic growth and development in the region as well as the state as a whole.

Interstate 10 from U.S. 90 to U.S. 129
Approximately nine miles of Interstate 10 from U.S. 90 to U.S. 129 in Suwannee County is scheduled to be resurfaced in 2011 at an estimated cost of $16 million.

County Road 252 Resurface and Widening
Improvements to County Road 252 (Pinemount Road) in Suwannee County began Monday, January 4. This roadway project will require daytime lane closures and other impacts to residents and motorists who use this county roadway. The project, located between the Columbia County line and County Road 137, will resurface and widen the roadway three feet on each side to provide 12-foot travel lanes.

Taylor

County Road 14 Resurfacing from U.S. 221 to Madison County Line
Resurfacing and adding 2-foot paved shoulders from U.S. 221 to the Madison County line (3 miles).

Perry Sidewalks
Design and build sidewalks around Perry Primary School and Taylor County Middle School.

U.S. 19 Resurfacing from 12th Street to Madison County Line
Resurfacing from 12th Street to the Madison County line (15.6 miles).

U.S. 98 Resurfacing from Jefferson County Line to Caddage Grove Road
Resurfacing from the Jefferson County line to 12 miles east.

Union

State Road 238 Resurfacing from Columbia County line to Lake Butler
A 14 mile resurfacing project from the Columbia County line to Lake Butler began, January 25, 2010 and is expected to finish in the summer of 2010.