Interstate 10/Interstate 95 Interchange Reconstruction
February 2005 - Spring 2011
The I-10/I-95 Interchange from Stockton Street and the Fuller Warren Bridge to Adams Street is currently under construction. The project will not only increase the capacity of the Interchange but will also eliminate many of the current cross-lane weaving movements that drivers must negotiate as they use the current interchange. (2132431)

Interstate 10 from east of Halsema Road to Lane Avenue
January 2009 - Spring 2012
A Florida Department of Transportation project to widen and improve 8.2 miles of I-10 from Lane Avenue to east of Halsema Road began in January 2009. The $58 million construction project involves widening I-10 from four to six lanes from I-295 to east of Halsema Road. Construction is scheduled to be complete in the spring of 2012.

Interstate 10 from Lane Avenue to Stockton Street
June 2009 - Early 2012
Rehabilitating concrete pavement between Lane Avenue and Stockton Street (4 miles).

Interstate 10 Interchange at Marietta/Hammond
January 2014 - Late 2016
Reconstruction of the Marietta interchange with Interstate 10 is in the FDOT's Five Year work program, project #213301-2 . Design plans are approximately 60% complete (Phase II).

Interstate 10 Master Plan West
2003 - Completed
The purpose of an Interstate Master Plan is to guide the development of a multi-modal interstate system that will serve the transportation needs of people, provide for the efficient and effective movement of freight, and foster economic growth and development in the region as well as the state as a whole.

Interstate 295, Interstate 95 and S.R. 9A Interchange
October 2007 - Summer 2010
Reconstruct interchange with Interstate 295, Interstate 95 North and State Road 9A including building a flyover ramp and adding interchange lighting. (2133234)

Interstate 295 at Collins Road Interchange
Fall 2010 - Early 2014
Construct a new interchange and collector distributor road system at Interstate 295 and Collins Road.

Interstate 10 Master Plan East
February 2004 - Completed
A master plan for interstate Highway 10 (I-10) from east of I-295 at Lane Avenue to Stockton Street was completed in February 2009.

Interstate 95 from Butler Boulevard to Atlantic Boulevard
2010/2011 - Early 2013
Rehabilitate 6.6 miles of concrete pavement on Interstate 95 between JT Butler Boulevard (State Road 202) and Atlantic Boulevard (SR 10) in 2010/11 at estimated $26.6 million. (2132172)

Interstate 95 from south of Greenland to Butler Boulevard
2009/2010 - 2011/2012
Rehabilitate 8.6 miles of concrete pavement on Interstate 95 from south of Greenland to J. Turner Butler Boulevard (State Road 202) in 2009/10 at estimated $36.8 million. Nelson Bedenbaugh/project designer. (2132175)

Interstate 95 at Southhampton and Hendricks Avenue
2011/2012 - Early 2014
Replace the bridges on Interstate 95 at Southhampton and Hendricks Avenue in 2011/12 at estimated $132 million. Craig Teal, FDOT Project Manager. (2133043)

Interstate 95 ramp at Southside Boulevard
2011/2012 - to be announced
Improve Interstate 95 ramp at Southside Boulevard (State Road 115) in 2011/12 at estimated $191,000. (209622)

Interstate 95 from Lem Turner Road to Heckscher Drive
late 2010 - Early 2011
Landscape Interstate 95 from Lem Turner Road to Heckscher Drive in late 2010 at estimated $2 million. John Thrasher, FDOT Project Manager. (2132452)

Interstate 295 Master Plan
06/30/2008 - to be announced
Work on an I-295 Master Plan is schedule to begin in June 2008.

State Road 9A Landscape at Butler Blvd Interchange
2010/2011 - 2011/2012
Landscaping State Road 9A at the Butler Boulevard Interchange (State Road 202) in 2010/2011. Jessee Manalo is FDOT Project Designer. (2092783)

State Road 9A from Main Street to New Berlin Road
September 2009 - Spring 2010
Resurface State Road 9A from Main Street to New Berlin Road. (2133463)

State Road 9A from Monument to I-95 North ITS
2010/2011 - July 2012
Install Intelligent Transportation System (ITS) from Monument to I-95 North at an estimated $7.8 million. (2132383, 2132385).

State Road 9B from SR 9A to US 1 (Philips Highway)
Summer 2010 - Summer 2012
Phase one of State Road 9B begins at State Road 9A and extends approximately three miles to U.S. 1.

State Road 9B from U.S. 1 to Interstate 95
Unfunded - Unknown
State Road 9B is proposed to extend from U.S. 1 to Interstate 95 during phase two.

Interstate 95 Intelligent Transportation System
November 2009 - Summer 2010
Adding Intelligent Transportation System (ITS) from just south of the Duval County line to north of Interstate 295.

Atlantic Boulevard (State Road 10) and Third Street (State Road A1A) Update Traffic Signals
October 2009 - Summer 2010
Updating traffic signals from Mayport Road to Ninth Avenue North.

Beach Boulevard (U.S. 90) Lane Addition between Hodges Blvd and San Pablo Road
August 2009 - Spring 2011
Adding two lanes between Hodges Boulevard and San Pablo Road (1.5 miles).

Edgewood Avenue (State Road 111) Replacing Traffic Signals
January 2010 - Summer 2010
Replacing traffic signals from Beaver Street (U.S. 90) to Kings Road (2.3 miles).

Hart Bridge (State Road 228) Repairs and Repainting
February 2009 - Late 2010
Repairing the steel and repainting the bridge over the St. Johns River.

Heckscher Drive (State Road 105) Replace Bridge over Shad Creek
June 2009 - Fall 2010
Replace bridge over Shad Creek.

Butler Boulevard (S.R. 202) Lane Addition and Resurfacing from east of Kernan Blvd to San Pablo Road
July 2007 - Early 2010
Adding two lanes and resurfacing from east of Kernan Boulevard to San Pablo Road (5.8 miles).

Heckscher Drive (State Road 105) Repaint Bridge over Sisters Creek
March 2010 - Fall 2011
Repainting bridge over Sisters Creek.

Ninth Street South in Jacksonville Beach Resurfacing, Drainage and Safety Improvements
January 2010 - Summer 2011
Resurfacing, drainage and safety improvements and signal upgrades from Osceola Street to First Avenue South (1.7 miles).

Old Mayport Road (State Road 101) Lighting
February 2010 - Summer 2010
Installing a large overhead lighted sign near the intersection of State Road A1A and Mayport Crossing.

Arlington Expressway (State Road 10A) Traffic Signal Updates
April 2010 - Fall 2010
Traffic signal update from the Southside Connector to the Regency Square (.4 mile).

Baymeadows Road (State Road 152) Traffic Signal Updates
February 2010 - Fall 2010
Updating traffic signals from U.S. 1 (Philips Highway) to State Road 115 (Southside Boulevard).

Alta Drive/New Berlin Road Resurfacing
December 2010 - Fall 2010
Resurfacing and paving shoulders on Alta Drive from New Berlin Road to State Road 9A and on New Berlin Road from Zoo Parkway to Alta Drive (1.5 miles).

Heckscher Drive (State Road 105) Resurfacing from New Berlin Road to Blount Island Drive
March 2010 - Summer 2010
Resurfacing from New Berlin Road to Blount Island Drive (1.1 miles).

News Kings Road (U.S. 1) Sidewalk Addition from Hema Road to Richardson Road
May 2010 - Late Summer 2010
Building 5-foot concrete sidewalk from Hema Road to Richardson Road (.2 mile).

Zoo Parkway (State Road 105) Resurfacing from Main Street (U.S. 17) to Busch Drive (S.R. 163)
March 2010 - Summer 2010
Resurfacing from the railroad crossing just east of Main Street (U.S. 17) to Busch Drive (State Road 163) (1.1 miles).

U.S. 301 Pavement Improvements
May 2010 - Late 2010
Improvements to U.S. 301 in western Duval County began in May and will continue throughout the summer as the pavement will be replaced to provide a smoother and safer ride, according to the Florida Department of Transportation.

Interstate 95 Master Plan
06/30/2009 - 06/30/2009
Interstate 95 (I-95) is the primary north-south limited-access highway on Floridas Atlantic coastline, providing linkage between numerous metropolitan areas including: Miami, Fort Lauderdale, West Palm Beach, and Jacksonville. Within northeast Florida, I-95 forms the north-south spine through St. Johns and Duval Counties.

Alerts involving Duval County

Interstate 10/Interstate 95 Interchange Resconstruction
September 4 - September 10, 2010: The ramp from I-10 eastbound to I-95 northbound WILL BE TOTALLY CLOSED nightly between 10 p.m. and 5 a.m. from Tuesday, September 7 through Friday, September...

I-95/S.R. 9A East Interchange Reconstruction near JIA
September 4 - September 10, 2010: S.R. 9A eastbound between North Main Street and U. S. 17 WILL BE TOTALLY CLOSED between 9 p.m. and 5 a.m. on Wednesday, September 8. S.R. 9A westbound betwe...

I-10 Resurfacing from Lane Avenue to Halsema Road
September 4 - September 10, 2010: Single lanes on I-10 will be closed from Tuesday, September 7 through Thursday, September 9 at various locations within the project limits between 6:30 p.m....

Hart Bridge Repainting and Structural Repair
September 4 - September 10, 2010: There will be no lane or bridge closings over the extended Labor Day weekend. The lane and bridge closings will resume on Tuesday, September 7. Full bridge ...

I-10 Pavement Improvements between Stockton Street and Lane Avenue
September 4 - September 10, 2010: Lanes and various ramps within the project limits will be closed nightly between 6:30 p.m. and 5:30 a.m. from Tuesday, September 7 through Friday, September...

Beach Boulevard Widening between Hodges Boulevard and San Pablo Road
September 4 - September 10, 2010: Single lanes in both directions will be closed nightly from 7 p.m. to 6 a.m. from Tuesday, September 7 through Thursday, September 9. This project should be...

Baymeadows Road Traffic Signal Improvements
September 4 - September 10, 2010: Nightly lane closings will occur in both directions within the project limits between 8 p.m. and 6 a.m. from Monday, September 6 through Friday, September 1...

San Jose Boulevard Traffic Signal Structure repairs from I-95 to Haley Road
September 4 - September 10, 2010: No lane closings are scheduled for next week. This project should be finished in the early fall. ...

Sisters Creek Bridge Maintenance on Heckscher Drive
September 4 - September 10, 2010: One lane will be closed on Friday, September 10 from 8:30 a.m. to 4 p.m. Two-way traffic will be maintained using flaggers. The work should be finished this ...

U.S. 301 Resurfacing between U.S. 90 and Nassau County line
September 4 - September 10, 2010: Lanes may be closed at various times except between 6 a.m. and 8:30 a.m., weekdays. The work should be finished this fall. ...

J. Turner Butler Boulevard Maintenance over the ICWW
September 4 - September 10, 2010: Single westbound lanes will be closed daily between 9 a.m. and 3:30 p.m. from Tuesday, September 7 through Friday, September 10. This project should be finis...

103rd Street near Old Middleburg Road Roadway Maintenance
September 4 - September 10, 2010: Single lanes will be closed in both directions daily between 9 a.m. and 3 p.m. Monday through Friday with no lane closing hours on the weekends. Roadway main...

Beach Boulevard near Station Creek Road Turn Lane and Driveway Addition
September 4 - September 10, 2010: One eastbound lane will be closed daily between 9 a.m. and 3 p.m. (Monday through Friday) through Friday, September 24 for constructing a turn lane and driv...

Ortega River Bridge on State Road 211 Rehabilitation
September 4 - September 10, 2010: No lane closings are scheduled for next week. This project will be finished in the fall of 2011. ...

Dames Point Bridge Routine Bridge Maintenance
September 4 - September 10, 2010: Single lanes in both directions will be closed on Thursday, September 9 from 10 a.m. to 3 p.m. for routine bridge maintenance....