3rd Street (SR A1A) Pedestrian Hybrid Beacons in Jacksonville Beach
Overview

This project consists of the installation of two pedestrian hybrid beacons as well as milling and resurfacing, base work, shoulder treatment, drainage improvements, curb and gutter work, traffic signal installation, highway signing installation, sidewalk and bicycle path work, and other incidental construction on State Road A1A at 3rd Avenue South and 7th Avenue North in Duval County.

Traffic will be maintained in accordance with FDOT design standards throughout the project. No lane closures will be allowed from 6 a.m. to 8 p.m. Monday through Sunday, except for during drainage installation, which will be limited to a total of six days.

Project Photos
No photos at this time.
Project Documents
No documents at this time.
No Events at this time.
Project Details
Project Start:Early 2026
Expected Completion:Summer 2026
Cost:$1.9 million
Project #:449842-1
RoadsState Road A1A
CountiesDuval
CitiesJacksonville Beach
Contact
Photo of Brie IsomBrie Isom
904-360-5457
3rd Street (SR A1A) Pedestrian Hybrid Beacons in Jacksonville Beach
Overview

This project consists of the installation of two pedestrian hybrid beacons as well as milling and resurfacing, base work, shoulder treatment, drainage improvements, curb and gutter work, traffic signal installation, highway signing installation, sidewalk and bicycle path work, and other incidental construction on State Road A1A at 3rd Avenue South and 7th Avenue North in Duval County.

Traffic will be maintained in accordance with FDOT design standards throughout the project. No lane closures will be allowed from 6 a.m. to 8 p.m. Monday through Sunday, except for during drainage installation, which will be limited to a total of six days.

Project Details
Project Start:Early 2026
Expected Completion:Summer 2026
Cost:$1.9 million
Project #:449842-1
RoadsState Road A1A
CountiesDuval
CitiesJacksonville Beach
Contact
Photo of Brie IsomBrie Isom
904-360-5457
 
Link to FDOT's Facebook page (opens new browser window) Link to FDOT's Twitter page (opens new browser window) Link to FDOT's YouTube page (opens new browser window) Link to FDOT's Wordpress page (opens new browser window) Link to FDOT's Multimedia page (opens new browser window) Link to FDOT's RSS page (opens new browser window)

Florida Department of Transportation

Consistent, Predictable, Repeatable